Kenya government fires health worker strikers over failure to ‘report back to work’

Saturday, March 10, 2012

The Kenyan government has dismissed 25,000 striking health workers, mostly nurses, citing failure to heed government orders to recommence work and concern for the welfare of hospital patients. Speaking on behalf of the government, Alfred Mutua stated the workers were dismissed “illegally striking” and “[defying] the directive … to report back to work”, which he called “unethical”. The government asks that “[a]ll qualified health professionals, who are unemployed and/or retired have been advised to report to their nearest health facility for interviews and deployment”, Mutua stated.

The workers, who had been on strike for four days, were wishing to have improvements made to their wages, working conditions, and allowances. The strikes have caused a significant number of Kenyan hospitals to cease operations. According to Kenya Health Professionals Society spokesperson Alex Orina, the average monthly wage plus allowances for health workers in Kenya is KSh25,000 (£193, US$302 or €230) approximately. With an increasing number of reports of patients neglected in hospitals emerging, two trade unions met with the Kenyan government yesterday and negotitated a return to work, although a significant proportion of demonstrators defied the agreement, The Guardian reported.

Orina told Reuters the dismissals were “cat-and-mouse games, you cannot sack an entire workforce. It is a ploy to get us to rush back to work, but our strike continues until our demands are met”. Frederick Omiah, a member of the same society, believed the government’s actions would “make an already delicate and volatile situation worse”, expressing concern that demonstrations may continue in the capital Nairobi, amongst other locations. Kenya Medical Practitioners, Pharmacists and Dentists Union chairperson Dr. Victor Ng’ani described government actions as “reckless”.

Mutua said the health workers were “no longer employees of the government” and had been eliminated from the payroll. While Ng’ani told the BBC of difficulties with finding other workers as skilled and experienced, Mutua reportedly stated that this would not be an issue. “We have over 100,000 to 200,000 health professionals looking for work today,” Mutua commented. “There will be a lag of a day or two … but it is better than letting people die on the floor, at the gate, or suffer in pain”.

Deaths on South African roads at 1215 for December 2005

Thursday, January 5, 2006

According to the South African government’s Department of Transport, the number of fatalities on the country’s roads during December 2005 was 1,215. This is compared with 1,234 the previous year, where the total number of deaths in traffic accidents was 10,530.

Department of Transport spokeswoman, Collen Msibi, stated that 512 of the fatalities were pedestrians, 414 passengers, and 289 drivers. 2005 saw the number of vehicles on South Africa’s roads rise by nearly half a million to just under eight million with 779,000 new drivers adding to the dangers on the country’s roads.

“To deal with this high level of unsafety, traffic authorities will increase the number of patrol vehicles on the road, law enforcement officers and unmarked vehicles to do more spot checks and roadblocks,” Msibi said.

“Our analysis has revealed that most accidents are preceded by offences such as ignoring road signs, driving drunk, speeding, vehicles cutting in front of others, driving defective vehicles and fatigue.”

The road toll in South Africa is similar to that of South Korea, Mexico, Japan and Thailand. However, except for South Korea these countries have significantly larger populations.

The worst country in the world for deaths in road traffic accidents, is currently accepted to be China. Figures released for 2002 reveal that 250,007 people were killed in that year.

The South African government has acknowledged the problem since 2001. At that time they launched their “Arrive Alive” campaign, targeting vehicle condition, driver fitness, speeding and drunk driving.

A Beginner’s Guide To Table Setting

More On This Topic:

By Cassia Ann Jordan

For most people, table settings are something to admire at special events, such as gala dinners or weddings, and few of us pay much attention to table setting etiquette when we entertain in our homes. To make our dinner (or luncheon) tables more attractive, we use a clean tablecloth; set the table using matching silverware and china and occasionally plop a vase of flowers in the center. If you’ve never given much thought to how you set your table, you should. By creating the right mood for your gathering, beautiful table settings contribute much to the success of your party, whatever the occasion may be.

It’s important to be aware of the extensive variety of table setting options and ideas available to you so as to choose one that is appropriate to the occasion. A wedding table setting, which should enhance the romantic, elegant mood of the evening, would not make an appropriate baby shower table arrangement, for instance. If you are setting the table for a Valentine’s Day dinner for two, using candles and a touch of red can add a more personal, intimate touch.

Table settings differ not only according to the occasion, but also according to cultural traditions and perceptions. An Asian table setting is different from an African table arrangement or a western country-style one. Table settings can also be customized according to the time of the year and, of course, seasonal holidays. Using one of the many festive Christmas table settings will set the tone for your Christmas dinner and contribute to the cheerful mood of your guests, and carefully chosen Halloween table arrangements can add excitement and fun to a children’s Halloween party.

[youtube]http://www.youtube.com/watch?v=RcLIhnsXE-U[/youtube]

To learn how to create original, appropriate table settings that complement the setting of any event you are hosting, consider the points below:

– Imagination and creativity: These are the key factors in creating beautiful table settings for every occasion. By using your imagination, you will be able to put together lovely (and singular) table settings that need not cost too much money at all.

– Table color scheme: Regardless of whether you are setting the table for a children’s birthday party or a business luncheon, make sure that the colors of you tablecloth or placemats, napkins, china (or even paper plates) do not clash. You may use different colors or various shades of the same color – as long as the effect is pleasing to the eye.

– Centerpieces: A centerpiece is a wonderful way to enhance the beauty of your table and it can be as simple or as elaborate as you wish. A lovely vase of carefully chosen flowers, a bowl of colorful fruit, votives floating in a bowl of water are just some of the hundreds of centerpieces you can use to make your table setting more attractive and appetizing.

– Central theme: Always have some kind of a theme in mind as you decide on the table colors and / or centerpiece you want to use for your table setting. This makes it much easier to put together an appropriate, attractive table setting that will enhance the meal you are serving your guests. For instance, you could decide to use a tropical theme for the luncheon you are hosting to celebrate your friend’s July birthday. You might then choose a tropical fruit centerpiece and two different shades of green for the tablecloth and napkins.

Table setting is not only something to admire at formal functions. It doesn’t have to be elaborate or involve using expensive silverware and valuable crystal; simple, creative ideas can create wonderful table settings that will contribute immensely to the success of any event you host.

About the Author: Cassia is really a well-rounded publisher concerning creating an ideal function. The lady prefers using flower centerpieces or table setting etiquette in order to achieve that ideal atmosphere.

Source: isnare.com

Permanent Link: isnare.com/?aid=667575&ca=Home+Management

Zimbabwe submits to popular pressure: foreign currencies now legal tender

Thursday, January 29, 2009

Zimbabwe has decided to abandon its currency, the Zimbabwean dollar, in favour of other currencies.

Acting Finance Minister Patrick Chinamasa announced today that Zimbabweans will be allowed to make transactions in other currencies along with the local currency. “In line with the prevailing practices by the general public, [the] government is therefore allowing the use of multiple foreign currencies for business transactions alongside the Zimbabwean dollar,” he said, adding that the Zimbabwean dollar will not be removed from circulation and would be used alongside other currencies.

This decision comes during the current period of hyperinflation, which has massively devalued the Zimbabwean dollar. Banknotes up to $100 trillion have been printed, despite the removal of ten zeroes from the currency last summer to try to make transactions easier. The official inflation rate, last updated in July 2008, was 231,000,000% a year, although independent estimates place the number as high as 6.5×10108, or 6.5 quindecillion novemdecillion, percent.

Up to now, only vendors with licenses were legally able to accept foreign currencies, although the practice was widespread — private businesses altogether refuse to accept the unstable Zimbabwean dollar.

Large sections of the workforce, including teachers and doctors, have gone on strike because hyperinflation rapidly renders their wages worthless. Representative groups said salaries, now measured in trillions of dollars, are insufficient to pay for even the bus fare to work.

Zimbabwe also faces other crises, including a cholera epidemic that has claimed the lives of over 3,000 people, according to statistics from the World Health Organisation.

[edit]

Australian health workers to close intensive care units in Victoria next week

Thursday, March 13, 2008

Members of Australia’s Health Services Union (HSU) will go on strike in Victoria next week in a dispute over stalled wage and career structure negotiations. Over 5000 physiotherapists, speech pathologists and radiation therapists will walk off the job next week, effectively closing the state’s 68 largest health services.

The strike will force the closure of intensive care units and emergency departments across the state.

It is feared the strike could continue into Easter.

National secretary of the HSU, Kathy Jackson said admissions would be crippled, while intensive care patients would have to be evacuated to New South Wales, Tasmania and South Australia as hospitals will not be able to perform tests or administer treatment.

“When an ambulance shows up you can’t admit a patient without an X-ray being available, you can’t intubate them and you can’t operate on them,” she said.

“If something goes wrong in an ICU you need to be able to X-ray, use nuclear medicine or any diagnostic procedure,” said Ms Jackson.

Ms Jackson said the HSU offered arbitration last year, but the state government refused. “They’re not interested in settling disputes, they hope that we are just going to go away.”

“We’re not going away, we’ve gone back and balloted the whole public health workforce in Victoria, those ballots were successful, 97 percent approval rating,” she said.

The HSU is urging the government to commence serious negotiations to resolve the dispute before industrial action commenced.

The government has offered the union a 3.25 per cent pay increase, in line with other public sector workers but the union has demanded more, but stopped short of specifying a figure.

Victorian Premier John Brumby said the claim would be settled according to the government’s wages policy. “The Government is always willing and wanting to sit down and negotiate with the relevant organisations . . . we have a wages policy based around an increase of 3.25 per cent and, above that, productivity offset,” he told parliament.

The union claims it is also arguing against a lack of career structure, which has caused many professionals to leave the health service. Ms Jackson said wages and career structures in Victoria were behind other states.

Victorian Opposition Leader Ted Baillieu said he was not in support of the proposed strike and called on the government to meet with unions. “There could not be a more serious threat to our health system than has been announced today.”

“We now have to do whatever is possible to stop this strike from proceeding,” he said.

The opposition leader will meet with the union at 11:30 AM today.

Victorian Hospitals Industry Association industrial relations services manager Simon Chant said hospitals were looking at the possible impact and warned that patients may have to be evacuated interstate if the strike goes ahead.

Events cancelled at Humber due to college strike

Wednesday, March 8, 2006

Due to the province-wide college strike, events at Humber College in Etobicoke, Ontario, Canada have been cancelled or delayed.

Latin Jazz Night, set to happen on Wednesday evening at 8:00 pm is cancelled, as is an Evening of Sketch Comedy, which was scheduled for Sunday, March 12 at 8:00 pm.

The Evening of Sketch Comedy is organized by students of the Humber School of Comedy. Humber is the only institution to offer comedy courses at a post-secondary or post-graduate level. The Evening is a part of students’ marks.

Theatre Humber’s production of The Rover has survived the axe. Set to play from Friday, March 31 – Saturday, April 8 at the Humber Theatre, it has been pre-emptively postponed.

Faculty of 24 colleges across the province went on strike as of Monday night, after no deal was made in continued collective bargaining.

2008 Leisure Taiwan launched in Taipei World Trade Center

Saturday, July 19, 2008

This year’s Leisure Taiwan trade show (a.k.a Taiwan Sport Recreation and Leisure Show) started yesterday, with 131 companies participating including sports media companies such as ESPN and VideoLand Television, businesses selling sports equipment and fitness clubs.

There were also a variety of sports being played in the arena built for the trade show. The events included a 3-on-3 basketball tournament, free style shooting, and bicycle test-riding. In addition, conferences discussed issues related to sports and physical education.

A major topic in the trade show was energy-efficiency and, as a result, bicycles and similar sports equipment were being heavily promoted.

Next Tuesday, companies from the electronics industry plan to promote their industry at “2008 Digital E-Park.” In previous years, organizations from the electronics industry have showcased their products at Leisure Taiwan instead of at the Digital E-Park, so this move has reduced the number of markets covered by Leisure Taiwan.

World’s largest passenger airliner makes first flight

April 27, 2005

The world’s largest passenger aircraft, the Airbus A380, has made its maiden flight after lifting off from Toulouse in France.

The take-off, at 08:30 UTC, was apparently normal and took place exactly on time. The aircraft flew into clear blue skies with a flight crew of six (all wearing parachutes as a safety precaution) and twenty tonnes of test equipment on board.

Around 50,000 people watched the maiden flight, many sitting on grass banks lining the runway. More people watched the flight on a giant screen erected in the centre of Toulouse.

The test flight lasted four hours, with the aircraft flying no higher than 10,000 nor further than 100 miles from Toulouse as it circled the Bay of Biscay.

The A380, known for many years during its development phase as the Airbus A3XX, will be the largest airliner in the world by a substantial margin when it enters service.

The first A380 prototype was unveiled during a lavish ceremony in Toulouse, France, on January 18, 2005. Its manufacturer’s serial number is 001, and it is registered F-WWOW.

The new Airbus will initially be sold in two versions: the A380-800, a full double-decker configuration, able to carry 555 passengers in a three-class configuration or up to 800 passengers in a single-class economy configuration. Range for the A380-800 model is expected to be 8,000 nautical miles (14,800 km). The second model, the A380-800F dedicated freighter, will carry 150 tons of cargo 5,600 miles (10,400 km).

The cost of the project so far is £8.4bn, £1bn over budget. 144 planes have already been ordered. Singapore Airlines, which will be the first company to operate the new air giant, in July 2006, have opened a reservation site for this first regular flight.

NTSB releases updates on status of 3 major US investigations

Sunday, June 17, 2007

The National Transportation Safety Board (NTSB), the agency responsible for investigating transportation accidents in the United States, released updates on three major investigations on June 14.

The NTSB, well known publicly for its involvement in the investigation of aviation incidents which involve harm or loss of human life, is also an agency that oversees the transportation of refined petroleum and gas products, chemicals and minerals.

The agency determined the cause of a natural gas pipeline explosion that killed six. It also detailed the cause of an accidental release of 204,000 gallons of anhydrous ammonia from a pipeline in an environmentally sensitive area, and released preliminary information involving two commercial aircraft coming within 30-50 feet of each other on a runway.

In the gas explosion disaster, the towing vessel Miss Megan, which was of specifications that did not require inspection by the United States Coast Guard, was being operated in the West Cote Blanche Bay oil field in Louisiana by Central Boat Rentals on behalf of Athena Construction on October 12, 2006. The Miss Megan was pushing barge IBR 234, which was tied along the starboard side of barge Athena 106, en route to a pile-driving location. Athena Construction did not require its crews to pin mooring spuds (vertical steel shafts extending through wells in the bottom of the boat and used for mooring) securely in place on its barges and consequently this had not been done. During the journey, the aft spud on the Athena 106 released from its fully raised position. The spud dropped into the water and struck a submerged, high-pressure natural gas pipeline. The resulting gas released ignited and created a fireball that engulfed the towing vessel and both barges. The master of the towing vessel and four barge workers were killed. The Miss Megan deckhand and one barge worker survived. One barge worker is officially listed as missing.

The NTSB blames Athena Construction for the disaster, citing in the final report that Athena Construction’s manual contained no procedures mandating the use of the safety devices on the spud winch except during electrical work. It was found that if the Athena 106 crew had used the steel pins to secure the retracted spuds during their transit, a pin would have prevented the aft spud from accidentally deploying. Furthermore, the spud would have remained locked in its lifted position regardless of whether the winch brake mechanism, the spud’s supporting cable, or a piece of connecting hardware had failed.

The NTSB also found that contributing to the accident was the failure of Central Boat Rentals to require, and the Miss Megan master to ensure, that the barge spuds were securely pinned before getting under way. The Board noted that investigators found no evidence that the Miss Megan master or deckhand checked whether the spuds had been properly secured before the tow began. While Central Boat Rentals had a health and safety manual and trained its crews, the written procedures did not specifically warn masters about the need to secure spuds or other barge equipment before navigating. The NTSB stated that the company’s crew should have been trained to identify potential safety hazards on vessels under their control.

NTSB Chairman Mark Rosenker said of the investigation’s results, “Having more rigorous requirements in place could have prevented this accident from occurring. Not only do these regulations need to be put in place but it is imperative that they are enforced and adhered to.”

The NTSB has made a number of safety recommendations as a result of this accident and the subsequent investigation. Recommendations were made to Athena Construction and Central Boat Rentals to develop procedures and train the employees of its barges to use the securing pins to hold spuds safely in place before transiting from one site to another.

The most major of the other recommendations are:

To the Occupational Safety and Health Administration:

  • Direct the Maritime Advisory Committee for Occupational Safety and Health to issue the following documents document to the maritime industry: (1) a fact sheet regarding the accident, and (2) a guidance document regarding the need to secure the gear on barges, including spud pins, before the barges are moved, and detailing any changes to your memorandum of understanding with the Coast Guard.

To the U. S. Coast Guard

  • Finalize and implement the new towing vessel inspection regulations and require the establishment of safety management systems appropriate for the characteristics, methods of operation, and nature of service of towing vessels.
  • Review and update your memorandum of understanding with the Occupational Safety and Health Administration to specifically address your respective oversight roles on vessels that are not subject to Coast Guard inspection.

The NTSB also released the result of its investigation into an environmental disaster in Kansas on October 27, 2004 in which 204,000 gallons (4,858 barrels) of anhydrous ammonia was spilled from a ruptured pipeline in Kingman into an environmentally sensitive area. Chemicals from the pipeline entered a nearby stream and killed more than 25,000 fish, including some fish from threatened species.

The incident reached the scale that it did due to operator error after the initial rupture. The 8 5/8-inch diameter steel pipeline, which was operated by Enterprise Products Operating L.P., burst at 11:15 a.m. in an agricultural area about 6 miles east of Kingman, Kansas. A drop in pipeline pressure, indicating abnormal conditions or a possible compromise in pipeline integrity, set off alarms displayed on the computerized pipeline monitoring system. Shortly after the first alarm the pipeline controller, in an attempt to remedy the low pressure, increased the flow of anhydrous ammonia into the affected section of pipeline. A total of 33 minutes elapsed between the time when the first alarm indicated a problem with the pipeline and the initiation of a shutdown.

In its initial report to the National Response Center (NRC), the pipeline operator’s accident reporting contractor reported a release of at least 20 gallons of ammonia, telling the NRC that an updated estimate of material released would be reported at a later time. No such report was ever made. Because of the inaccurate report, the arrival of representatives from the Environmental Protection Agency was delayed by a full day, affecting the oversight of the environmental damage mitigation efforts.

The cause of the rupture itself was determined to be a pipe gouge created by heavy equipment damage to the pipeline during construction in 1973 or subsequent excavation activity at an unknown time that initiated metal fatigue cracking and led to the eventual rupture of the pipeline.

“We are very fortunate that such highly toxic chemicals of the size and scope involved in this accident were not released in a populated area,” commented Rosenker. “Had this same quantity of ammonia been released near a town or city, the results could have been catastrophic.”

As a result of this accident, the NTSB made the following safety recommendations:

To the Pipeline and Hazardous Materials Safety Administration:

  • Require that a pipeline operator must have a procedure to calculate and provide a reasonable initial estimate of released product in the telephonic report to the National Response Center.
  • Require that a pipeline operator must provide an additional telephonic report to the National Response Center if significant new information becomes available during the emergency response.
  • Require an operator to revise its pipeline risk assessment plan whenever it has failed to consider one of more risk factors that can affect pipeline integrity.

To Enterprise Products Operating L.P.:

  • Provide initial and recurrent training for all controllers that includes simulator or noncomputerized simulations of abnormal operating conditions that indicate pipeline leaks.

“The severity of this release of dangerous chemicals into the community could have been prevented,” said Rosenker. “The safety recommendations that we have made, if acted upon, will reduce the likelihood of this type of accident happening again.”

As well as concluding their investigation of the above accidents, the NTSB also released preliminary information regarding a serious runway incursion at San Francisco International Airport between two commercial aircraft on May 26, 2007.

At about 1:30 p.m. the tower air traffic controller cleared SkyWest Airlines flight 5741, an Embraer 120 arriving from Modesto, California, to land on runway 28R. Forgetting about the arrival airplane, the same controller then cleared Republic Airlines flight 4912, an Embraer 170 departing for Los Angeles, to take off from runway 1L, which intersects runway 28R.

After the SkyWest airliner touched down, the Airport Movement Area Safety System (AMASS) alerted and the air traffic controller transmitted “Hold, Hold, Hold” to the SkyWest flight crew in an attempt to stop the aircraft short of runway 1L. The SkyWest crew applied maximum braking that resulted in the airplane stopping in the middle of runway 1L. As this was occurring, the captain of Republic Airlines flight 4912 took control of the aircraft from the first officer, realized the aircraft was traveling too fast to stop, and initiated an immediate takeoff. According to the crew of SkyWest 5741, the Republic Airlines aircraft overflew theirs by 30 to 50 feet. The Federal Aviation Administration has categorized the incident as an operational error.

The NTSB sent an investigator to San Francisco, who collected radar data, recorded air traffic control communications, and flight crew statements, and interviewed air traffic control personnel prior to the NTSB making the preliminary release.

Gliders defeat USA in 2012 Paralympic semifinals

Saturday, September 8, 2012

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6

London, England — The Australian women’s national wheelchair basketball team, the Gliders, defeated the USA Thursday in a 40–39 thriller at the North Greenwich Arena.

This semifinal victory advances the Gliders into the final, where they are to meet the winner of the day’s match between the Netherlands and Germany. They are guaranteed at least silver. The Gliders won silver in Sydney in 2000 and Athens in 2004 and bronze in Beijing in 2008, but have never won the gold. The USA team is to meet the loser of that match to contest the bronze.

The Gliders’ quest for Paralympic gold medals began last week with a narrow 52–50 defeat of Brazil. The Aussies then crushed Great Britain 51–24. Australia had a loss to Canada 50–57, but bounced back to win against the Netherlands, 58–49. This advanced Australia to the quarter final, where the Gliders met and defeated Mexico 62–37.

Team USA started by defeating France 63–24 in its first game. It then lost to Germany, 54–48. It came back and defeated Mexico 67–33. Team USA came from 21 behind to defeat China in extra time, and played Canada and won in the quarter final 67–55.

The first quarter got off to an exciting start. USA had first possession and chalked up the first score. Kylie Gauchi responded quickly with a good shot, leveling the score. Then followed an exciting passage of play in which USA turned the ball over, but Clare Nott lost it on a bad pass. Shelly Chaplin then stole it back but Kylie Gauchi put it out of bounds. Clare Nott stole it back again, only to have Gauichi turn it over again. The USA took a shot at the basket from inside the paint, but missed. They then took a rebound and finally scored. A USA free throw extended their lead to 2–6. Thereafter both teams’ shooting was poor, and the score was only 10–12 at quarter time.

The second quarter started with Merritt scoring twice to give Australia the lead 14–12. A ferocious Australian defence saw USA’s style severely cramped, and they turned the ball over a number of times. They also took too long to move the ball forward. The crowd included the familiar block of Gliders fans in yellow T-shirts. They made their presence felt, chanting “Defence, Gliders, Defence!” whenever USA had the ball. Unfortunately, the Gliders’ poor shooting prevented them from fully capitalising on their superb defence, leaving the score tied at 26–26 at half time.

In the third quarter, an early goal by Kylie Gauchi from outside the paint gave the Gliders the lead. A series of steals gave the Gliders additional shots at goal, most of which missed, but USA had no answer to the Australian defence, with a series of timeouts and turnovers, and their shooting was even poorer. While the Australians relentlessly racked up point after point, taking a 32–26 lead, USA were unable to score at all until the last minute of the quarter. A hurried goal with seconds to go by Katie Hill saw the Gliders leading 38–28 at the last change.

In the fourth quarter, the Australian defence remained taut, but the shooting remained terrible. In the final accounting, Cobi Crispin only made 3 out of 10 shots, and Amber Merritt only 4 out of 16. The Glider’s most accurate shot turned out to be Clare Nott, who made four out of five attempts. Meanwhile, an increasingly desperate USA team pegged the Australians back to 40–39. Three timeouts were taken in the last minute. Fouls saw Merritt sent to the free throw line, but she missed both shots. The game went down to the last second, with USA missing a shot from inside the paint, before the shot clock ran out.